The Next Big Thing Downtown

Active Construction

Updated August 1, 2008

North Mall: 5th and 6th avenues between Irving and Burnside

Light Rail Construction

Light rail construction increases on the Steel Bridge, closing the bridge to MAX from August 2 through 24. The work takes place 24 hours a day, seven days a week. Crews are digging, jack hammering, strengthening the bridge structure, building pole foundations, installing and welding rail, and paving roadway. Between 6 p.m. and 7 a.m., construction noise will be limited and floodlights will be used for safety. Traffic impacts include:

The closure is necessary while crews prepare to connect the new MAX tracks on 5th and 6th avenues with the existing MAX system on the bridge. Bicycle and pedestrian access will be maintained on the lower deck and intermittently on the south side of the upper deck. Learn more about Steel Bridge construction and view the work live via the Steel Bridge Construction Camera.

Station and Sidewalk Finishing/Electrical Systems Installation

Station and sidewalk finishing work is taking place on 5th and 6th avenues between Irving and Burnside streets. This work occurs Monday through Saturday from 7 a.m. to 3:30 p.m.. Vehicle traffic may encounter short detours and intermittent lane closures. Pedestrians are rerouted around construction zones, but access to buildings and businesses is maintained. Crews are restoring sidewalks, erecting and painting poles, installing traffic signals and working on overhead wires.

  • Sidewalk restoration is under way on the east and west sides of 5th and 6th avenues between Burnside and Irving streets. Through pedestrian traffic is restricted, but access to businesses and residences is maintained.

North Mall merchants are open for business during construction. Please join us in supporting these businesses located on 5th and 6th avenues.

Adobe Reader icon Download printable PDF


Central Mall: 5th and 6th avenues between Burnside and Salmon

Station and Sidewalk Finishing/Electrical Systems Installation

Station and sidewalk finishing work continues on 5th and 6th avenues. Vehicle traffic may encounter short detours and intermittent lane closures. Pedestrians are rerouted around construction zones, but access to buildings and businesses is maintained. Crews are rebuilding curb ramps, constructing foundations for poles and shelters, restoring sidewalks, erecting poles, installing traffic signals and working on overhead wires. The work occurs Monday through Saturday from 7 a.m. to 3:30 p.m., with some brick sidewalk work occurring between midnight and 7 a.m. in order to minimize daytime pedestrian impacts.

Central Mall merchants are open for business during construction. Please join us in supporting these businesses located on 5th and 6th avenues.

Adobe Reader icon Download printable PDF


South Mall: 5th and 6th avenues between Salmon and Jackson

Light Rail Construction

Light rail construction is under way at the South Terminus. The work occurs Monday through Friday from 7 a.m. to 3:30 p.m. Crews are building a new substation and communications building and installing electrical poles and wires.

  • Jackson Street is limited to local access only between 5th and 6th avenues.

Station and Sidewalk Finishing/Electrical Systems Installation

Station and sidewalk finishing work continues on 5th and 6th avenues between Salmon and Jackson streets. The work occurs Monday through Saturday from 7 a.m. to3:30 p.m. Vehicle traffic may encounter short detours and intermittent lane closures. Pedestrians are rerouted around construction zones, but access to buildings and businesses is maintained. Crews are rebuilding curb ramps, drilling pole foundations, building foundations for light rail and bus shelters, and restoring the brick sidewalk.

  • The west sidewalks on 6th Avenue between Jefferson and Columbia streets and between Columbia and Clay streets are now open.

 

South Mall merchants are open for business during construction. Please join us in supporting these businesses located on 5th and 6th avenues.

Adobe Reader icon Download printable PDF

Adjacent Construction: City of Portland Sewer Repairs

The City of Portland Bureau of Environmental Services (BES) is performing sewer work under several streets that cross the Mall. While many of the sewer repair sites are located in or near TriMet work zones, the sewer repairs are unrelated to TriMet’s efforts to prepare the Mall for new light rail and the return of bus service. Visit BES for additional information.

Road closure map and information

View a map and description of all current road closures and traffic impacts in downtown Portland, updated weekly, at keepportlandmoving.org.

You can sign up to receive construction updates by email or add the RSS feed to your news reader.